DIASYS netmation

Oil firing power plant in Saudi Arabia

Overview

This oil firing plant consists of 5 units of oil firing boilers, turbine and desalination equipment.

Background of Introduction and Issues

After operation for more than 20 years, the control units, including the boiler control unit, turbine control unit, and incidental equipment control units such as for seawater desalination, were replaced with the most advanced DIASYS Netmation. To replace these control units while supplying high-demand water and electric power as much as possible, we had a challenge to construct units one by one in a short time period without interrupting the operation of the other four units.

Achievements and Effects of Introduction

We completed the construction of all units in only 17 months (about three months per unit including common facilities) as scheduled, and handed them over to the customer. Mitsubishi Hitachi Power Systems has deep knowledge of power plants including know-how of boiler control and turbine control. It has the advantage of being able to totally undertake all aspects of a power plant project ranging from design/production of control units meeting conditions of existing equipment, on-site construction, adjustments, to test runs.

System Configuration

System Configuration

System Configuration

System Configuration

Related Products

Catalog Download

Get Adobe Reade Download Adobe Reader
To view Adobe Portable Document Format (PDF) files, you need the free Adobe Reader software from Adobe Systems Incorporated. By installing Adobe Reader you can view and print PDF files.
Adobe and Adobe logo are trademark of Adobe Systems Incorporated.

Products & Service

Quality assurance,Information security

Quality assurance

 

Information security ISO27001

Contact Us

Inquires via email

The information on this page has been authorized by MITSUBISHI HITACHI POWER SYSTEMS, LTD. For further information, please click the link below.

http://www.mhps.com/en/products/category/diasys.html

Page Top